Fabrication Module Assembly

Fabrication Module Assembly

Contact Andy Ferguson at 904.249.1400Request a Quote

Industrial RefrigerationIndustrial HVAC/MechanicalEngineeringThermal ConstructionMaintenance Parts & ServiceFabrication Module AssemblySkid Design & Manufacturing

Industrial RefrigerationIndustrial HVAC/MechanicalEngineeringThermal ConstructionMaintenance Parts & ServiceFabrication Module AssemblySkid Design & Manufacturing

Refrigeration Module Fabrication Shop

Module Fabrication Shop

JAX Refrigeration recently expanded our Jacksonville, Fla. fabrication shop to over 30,000 square feet, allowing us to prefabricate systems and skid packages for our contracting projects across the nation. Our shop is a fully functioning fabrication and assembly facility, welding high-level carbon and stainless steel components for the industrial market. Our facility can prepare entire prepackaged refrigeration systems or manufacture individual skids and modules.

Welding for Commercial and Industrial Projects

Specialized Welding for Commercial and Industrial Projects

At the JAX Refrigeration Fabrication Shop, we execute all four major types of welding procedures, SMAW, GMAW/MIG, FCAW and GTAW/TIG and employ independent testing and continuous training to verify the quality of all our welds. With a flawless safety record, our veteran pipe welders expertly weld plate and pipe up to the 6G level, widely considered to be the gold standard among welding professionals.

Welding: Plate and Pipe Welds

Plate and Pipe Welds

Plate Welds

  • Flat Position 1G – Plate in a horizontal plane with the weld metal deposited from above. (SMAW, FCAW, GTAW, GMAW Processes)
  • Horizontal Position 2G – Plate in a vertical plane with the axis of the weld horizontal. (SMAW, FCAW, GTAW, GMAW Processes)
  • Vertical Position 3G – Plate in a vertical plane with the axis of the weld vertical. (SMAW, FCAW, GTAW Processes)
  • Overhead Position 4G – Plate in a horizontal plane with the weld metal deposited from underneath. (SMAW, FCAW, GTAW Processes)

Pipe Welds

  • Flat Position 1G(R) – Pipe with its axis horizontal and rolled during welding so that the weld metal is deposited from above. (SMAW, FCAW, GTAW, GMAW Processes)
  • Horizontal Position 2G – Pipe with the axis vertical and the axis of the weld in a horizontal plane. Pipe will not be rotated during position. (SMAW, FCAW, GTAW, GMAW Processes)
  • Multiple Position 5G – Pipe with its axis horizontal and with the welding grove in a vertical plane. Welding shall be done without rotating the pipe. (SMAW, FCAW, GTAW Processes)
  • Multiple Position 6G – Pipe with its axis inclined at 45 degrees to horizontal. Welding shall be done without rotating the pipe. (Qualifies welder to all positions) (SMAW, FCAW, GTAW Processes)

Module Fabrication Project Approach

Project Approach and Philosophy

At JAX Refrigeration, we believe every system is a custom system. Our philosophy is rooted in innovation, both in creative design solutions and technical skill. Every system is tailored to the specific needs of the project, large or small.

JAX Refrigeration is known for integrating existing technologies and techniques in a unique way that creates systems with higher efficiency and lower cost. We deliver the ultimate in client satisfaction through our focus on proper load and functionality, low-cost operation and ease of maintenance for years to come.

A Licensed Module Fabrication Contractor

A Licensed Contractor Team You Can Trust

We are dedicated to providing unparalleled customer service. Our licensed contractors and professional, degreed engineers manage each project with a focus on innovation and immediate maintenance responsiveness. Our highly skilled team is trained on the latest in industry procedures and each of our superintendents has several decades of industry experience.

More Responsive. Better Results. Happier Clients. It’s the JAX Refrigeration way.

testimonial quotation

"We have been very impressed with the level of commitment and competence provided by JAX Refrigeration…and with the timely and accurate completion of all work assigned."

Richard W. Withers, General Counsel – Ashco, Inc.

Industrial RefrigerationIndustrial HVAC/MechanicalEngineeringThermal ConstructionMaintenance Parts & ServiceFabrication Module AssemblySkid Design & Manufacturing

Industrial RefrigerationIndustrial HVAC/MechanicalEngineeringThermal ConstructionMaintenance Parts & ServiceFabrication Module AssemblySkid Design & Manufacturing

Pre-Fab and Fabrication Facility

Fabrication Module Assembly
Services

Services
  • Plasma cutting
  • Carbon and stainless steel welding
  • All levels of fillet and groove welding (up to 6G)
  • Complete prepackaged systems and skids

Types of Welds
  • Shielded metal arc welding (SMAW)
  • Gas metal arc welding (GMAW/MIG)
  • Flux cored arc welding (FCAW)
  • Gas tungsten arc gas welding (GTAW/TIG)

Module Fabrication
  • Fully complete ammonia, glycol and chilled water refrigerated skids
  • Self contained refrigerated modules
  • Ship-to-site refrigerated modules
  • Roof pipe stands
  • Condenser stands
  • Miscellaneous steel

Request a
quote online

call Andy Ferguson
904.249.1400

Industrial RefrigerationIndustrial HVAC/MechanicalEngineeringThermal ConstructionMaintenance Parts & ServiceFabrication Module AssemblySkid Design & Manufacturing

Industrial RefrigerationIndustrial HVAC/MechanicalEngineeringThermal ConstructionMaintenance Parts & ServiceFabrication Module AssemblySkid Design & Manufacturing