Industrial Refrigeration, Commercial HVAC Systems and Cold Storage

C<span style=xP Data Center">

CxP Data Center

CxP Data Center

Project Manager: Jonathan Marti

Jacksonville, FL

2014

Air Conditioning System

Chilled Water Piping System

Call Jonathan MartiRequest a Quote

Industrial RefrigerationIndustrial HVAC/MechanicalEngineeringThermal ConstructionMaintenance Parts & ServiceFabrication Module AssemblySkid Design & Manufacturing

Industrial RefrigerationIndustrial HVAC/MechanicalEngineeringThermal ConstructionMaintenance Parts & ServiceFabrication Module AssemblySkid Design & Manufacturing

CxP Data Center: CxP Data Center – Jacksonville, FL

CxP Data Center – Jacksonville, FL

In early 2014, JAX Refrigeration was subcontracted by Haskell to provide the installation of an integral air conditioning and chilled water piping system for the CxP Data Center located in Jacksonville, Fla. The project scope included five chilled water Liebert air conditioning units with custom support stands, extended return, and supply plenums for each. This project was particularly challenging because the timeline allotted JAX Refrigeration only four weeks for the entire project, from start to finish.

CxP required a chilled water piping system that would keep their equipment cool and running efficiently around the clock – and they needed it fast – so JAX Refrigeration utilized some of the industry’s latest and most innovative technology, Aquatherm pipe. This pipe is specifically engineered for heating and cooling, industrial, geothermal and compressed air applications. It is non-corroding, which helps guard against future potential piping failures and provides better long-term solutions.

Additionally, typical steel pipe can be welded together in a little over an hour. Using the Aquatherm pipe reduced JAX Refrigeration’s welding process time to less than 11 minutes for heating and cooling and dropped the weight of the piping to almost an eighth of its traditional steel counterpart.

CxP Data Center opened its 120,000-square-foot facility in February 2014.

Awards

2015 Excellence In Construction Eagle Award

CxP Data Center Case Study Navigation

I was surprised by how quickly and easily the pipe and fittings could be joined without using an open flame and the hazard that accompanies it. It was also impressive how easy it was for them to put in tees or other fittings for future alterations or expansion, and when you combine that with its superior thermal value – it was a benefit and provided a cost advantage.

Preston Haskell, P.E., Founder and Chairman - The Haskell Company

Request a
quote online

Call us
904.249.1400

Industrial RefrigerationIndustrial HVAC/MechanicalEngineeringThermal ConstructionMaintenance Parts & ServiceFabrication Module AssemblySkid Design & Manufacturing

Industrial RefrigerationIndustrial HVAC/MechanicalEngineeringThermal ConstructionMaintenance Parts & ServiceFabrication Module AssemblySkid Design & Manufacturing